Climbing Wall Posts in chronological order:

Brainstorming

Brainstorming: Follow-Up

The Drive: How the Wall moves

Structural Analysis of the Wall

Things Go Sideways

Plank Wear

Parts Start Arriving

Prototype Frame Assembly: Part 1

Prototype Frame Assembly: Part 2

Prototype Frame Assembly: Part 3

Final Assembly: Part 1

Preliminary Test

Planks on Testing

More Testing

Testing Update

Electrical/Software Design

Success!

 

Other Posts:

ParetoWorks Review and Ice Axe Design

Frank Slide Bouldering

Adventure Time: Bolting in the Crowsnest Pass

Topo and Update

End of the Season: More Route Development

Advertisements