Steel Parts Have Arrived

I am stoked! This has taken much longer than I hoped (due to me getting distracted) but my sheet metal and HSS parts have arrived:

IMG_20160427_191023
My steel order! Also shown: my rake (not a part of the wall).

I have a critical component (drive shaft bearing) on back order, and a few remaining components to order from the US. I have been stalling on those because I want to find a cheaper source than McMaster-Carr for roller chain attachment links. So if anyone has a source for these please let me know. But I will probably start assembling the frame this weekend and see how it goes.

IMG_20160427_190937
Brackets in plastic wrap, Gearbox, and bearings.
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s